Incorrect Project Site Audit
complete
D
Dominic Vendittelli, CSP
Safety auditor indicated that this morning when using the SiteSpecs app, where his finger touched on the screen was mis-clicked somewhere else on the page. Last week did not have this issue.
Partly because of this issue, the incorrect project (Springwells) was selected instead of Pump Station 1 (PS1). Is there a way to relabel or delete the existing safety audit?
Photo Viewer
View photos in a modal
Log In

Sitespecs
updated the status to
complete
Hello Dominic Vendittelli, CSP
We deleted Safety Audit Upload ID 542714 from the 6606 - Springwells project.
We also fixed the issues you encountered and released a new version of the mobile app.
Please update your app to the latest version:
iOS:
Android:
Please let us know if you encounter any further issues.
Thank you.

Sitespecs
Hello Dominic Vendittelli, CSP, Alex Schultz-Spradlin
Please confirm whether this checklist upload:
which was uploaded in the “6606 - Great Lakes Water Authority - Springwells WTP 1958 Flocculator Replacement (Dearborn, MI)” project, should be moved to the “6612 South Monroe Pump Station Rehab” project.
Please provide the full project name so we can move the uploaded checklist to the correct project.
Sorry, could you also clarify what you mean by:
“While typing notes into the selected dialogue box, the text was deleted multiple times. Other times while typing, a different box would be selected while typing.”
Do you mean this happens while typing in the comment box? (see screenshot)
We tested this on our end but were unable to reproduce the issue. If possible, could you please provide a screen recording while completing the checklist so we can better understand what is happening?
Thank you.
Photo Viewer
View photos in a modal

Sitespecs
Dominic Vendittelli, CSP
Please confirm whether this checklist upload:
which was uploaded in the “6606 - Great Lakes Water Authority - Springwells WTP 1958 Flocculator Replacement (Dearborn, MI)” project, should be moved to the “6612 South Monroe Pump Station Rehab” project.
Please provide the full project name so we can move the uploaded checklist to the correct project.
Thank you.

Sitespecs
Dominic Vendittelli, CSP, Alex Schultz-Spradlin

Sitespecs
Dominic Vendittelli, CSP
Please review our previous message and reply so we can further assist you or close this ticket.
Thank you.

Sitespecs
Dominic Vendittelli, CSP, Alex Schultz-Spradlin
We found and fixed the issue you reported:
“While typing notes into the selected dialogue box, the text was deleted multiple times. Other times while typing, a different box would be selected while typing.”
A new version of the mobile app with this fix will be released soon.
However, we still need you to confirm which project the checklist upload should be moved to. Please provide the full project name so we can move it to the correct project.
Thank you.
D
Dominic Vendittelli, CSP
Sitespecs
Apologies on the delayed response. I didn't realize these notifications were going to my spam folder..
The Auditor was able to replicate the safety audit that same day to the appropriate project (which was the 6615 Pump Station 1 project) with the same pictures and details. The audit ID 542714 for 6606 - Springwells can be deleted, and this, along with the fix you mentioned, should resolve the issue.
D
Dominic Vendittelli, CSP
It was also indicated that while typing notes into the selected dialogue box, the text was deleted multiple times. Other times while typing, a different box would be selected while typing. For example, the selected box would jump from question 180 to question 50.